by Amy Self | Jan 23, 2020
We designed and renovated 60,000 square feet, two floors, and added 32,000 square feet to an existing Bayer building. The total project was approximately 6 million. An excellent example of combining the renovation of a 50+ year old building and incorporating a new construction addition to blend the past with the future. Use of bold color and movable glass walls allow for building flexibility whether it be for teaching or having a robotics competition.
“We are very pleased with the finished product from Ancon. Throughout the process Ancon was very attuned to the changes and modifications we wanted. Ancon’s architectural team was excellent in providing creative ideas throughout the project.”
Patsy Boehler, Executive Director
by Erik Christensen | Jan 15, 2020
Twenty-two thousand square feet, 600 person worship space, education, and fellowship center revolves around a central narthex hub. Careful attention to material selection and detail creates a high-quality structure evoking permanence and sensitivity to surrounding residential neighborhoods. A friendly and inviting structure conveys the feeling of worship and fellowship.
by Erik Christensen | Jan 13, 2020
We performed an in-depth site plan and engineering analysis to confirm that the existing Basney site would accommodate the new Honda requirements and the City of Mishawaka’s new storm water drainage requirements.
-
Ancon’s architects suggested improvements and enhancements to the Honda Plans, managed design meetings and implemented drawing changes with each of the departments, while still meeting the Honda standard building requirements and project budget.
-
Ancon’s project manager suggested a construction phasing plan that would allow the dealership to remain open and productive while still maintaining the project schedule.
-
Negotiated favorable parking, curb cuts, and landscaping requirements with the City of Mishawaka.
-
Performed cost-benefit analysis during design meetings which compared the renovation and addition solution with the teardown and build new solution.
-
Evaluated green alternatives for the site, building, geothermal heating, and equipment.
-
Implemented an engineered sub-surface storm water retention system to allow maximum use of property for paved parking and vehicle display.
-
Provided new energy-saving site lighting fixtures.
-
Utilized precast concrete exterior solutions to speed up construction and reduce the project’s impact on the business.
-
Coordinated all fixtures, furniture, signage, image and graphics packages.
by Amy Self | Jan 12, 2019
In 2019, Ancon Construction designed and constructed a 1,144-square-foot building addition onto the west side of the existing building located at 310 E. University Drive in Granger, Indiana. The addition included storage, a waiting area, two restrooms, workstations, along with office space and two exam rooms.
​